Summary sheet

Release date
7 May 2015
Status
Reference
Signed | 22/03/2016
20150061
Project name
Promoter - financial intermediary
PORTUCEL CACIA MILL OPTMISATION
PORTUCEL SA
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 25 million
EUR 59 million
Location
Sector(s)
Description
Objectives

The project is a modernisation and expansion of the existing Cacia (Aveiro) pulp mill to increase its efficiency and production from 287,000 to 353,000 tonnes per annum.

The project involves modernising the existing Cacia (Aveiro) pulp mill, aiming to remove process bottlenecks that currently prevent the plant from reaching its full, permitted nominal production capacity of 1000 tonnes per day. The project will also upgrade the air emission abatement systems to fully align the plant with the specifications established in the new draft Best Available Techniques (BAT) reference document for the pulp and paper industry. It will increase the annual output of the plant from its current 287,000 to 353,000 tonnes per annum. Due to process efficiency gains power output will increase by 3.4 MW to 29 MW. The modernised mill will produce high quality fibre (pulp) and generate renewable electricity associated with the pulp production process.

Environmental aspects
Procurement

The project falls under Annex II of Directive 2011/92/EU on environmental impact assessment (EIA) (modification of an industrial facility for the production of pulp). The existing plant, operational since 1953, has continuously undergone adaptations and modernisation cycles to incorporate best available technology. The latest environmental permit under the EIA and Integrated Pollution Prevention and Control (IPPC) Directives dates from 2009. The competent authorities concluded that the project did not add environmental load and did not exceed emission thresholds established in national environmental legislation for pulp and paper mills. Hence the project has been screened out. The IPPC permit from 2009 will be reconsidered by the competent authorities in line with the provisions of the Industrial Emissions Directive 2010/75/EU. The investment will be within the existing facilities and will thus have only negligible additional visual impact on the landscape. Because of the project's location at an existing industrial site, significant negative impact by the project on any site of nature conservation is considered unlikely. Due to the targeted investments in best available emission abatement technologies, the project will lead to reduced environmental impact in comparison to the existing plant. The targeted emission limits for the plant are in line with the latest draft BAT Reference Document. The Bank's Environmental Assessment Group (ENVAG) was consulted for review. The project will use wood sourced locally and from international wood markets under strict chain-of-custody systems and produced from forests managed under international recognised certification schemes. Details of the permitting procedures, potential impact on close-by nature conservation sites and sustainability and origin of the biomass will be further assessed during the appraisal.

The project sponsor is a private company of industrial or commercial character, not operating in the utilities sector as its main economic purpose and not having any special or exclusive right, and is therefore not affected by EU directives on procurement. However, if after the project appraisal, the EIB were to conclude that the project is after all subject to EU public procurement legislation (i.e. Directive 2004/17/EC), then the Bank would require the promoter to ensure that contracts for the implementation of the project have been/will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC and Directive 92/13/EEC), with publication of tender notices in the EU Official Journal, as and where required.

Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - PORTUCEL CACIA MILL OPTIMISATION
Publication Date
2 Jul 2015
Document language
Main Topic
Lending
Document Number
60106391
Document Focus
Environmental Information
Project Number
20150061
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Completion Sheet (ESCS) - PORTUCEL CACIA MILL OPTIMISATION
Publication Date
13 Nov 2018
Document language
Main Topic
Lending
Document Number
81639209
Document Focus
Environmental Information
Project Number
20150061
Sector(s)
Regions
Countries
Publicly available
Download now

News & Stories

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications