Amount
€ 71,285,999.43
Countries
Sector(s)
United Kingdom : € 71,285,999.43
Education : € 71,285,999.43
Signature date(s)
5/12/2016 : € 71,285,999.43
Link to source

Summary sheet

Release date
10 March 2016
Status
Reference
Signed | 08/12/2016
20150776
Project name
Promoter - financial intermediary
SWANSEA UNIVERSITY CAMPUS OPTIMISATION
SWANSEA UNIVERSITY
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 78 million (GBP 60 million)
EUR 157 million (GBP 121 million)
Location
Sector(s)
Description
Objectives

The main purpose of the project is to optimise the use of space of Swansea University's Singleton campus. The project will consist of the construction of the new student centre; reconfiguration and refurbishment of the Talbot Building; reconfiguration and refurbishment of the Library; upgrades of the specialised research laboratories and associated facilities of the Grade II listed Wallace Building; and reconfiguration and refurbishment of the Grade II listed Fulton House at the centre of the campus. In addition, construction of facilities for the University's new Computational Foundry at the Bay Campus will be included in the project.

The purpose of the project is to increase the relevance and quality of teaching, learning and academic research capacity at the Swansea University by increasing and improving the overall quality of the existing academic space.

Environmental aspects
Procurement

Universities and research institutions are not specifically mentioned in Directive 2011/92/EU on environmental impact assessment (EIA). An EIA is therefore not required. However, parts of the investment might be covered by Annex II of the directive in relation to urban development. The Bank's services will verify during appraisal whether an EIA is required for any component of the project. Potential impact on Natura 2000 conservation sites as well as operating procedures and systems related to animal testing, genetically modified organisms (GMOs), biosafety hazards and waste management will also be checked.

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - SWANSEA UNIVERSITY CAMPUS OPTIMISATION
Publication Date
16 Jun 2016
Document language
Main Topic
Lending
Document Number
67072330
Document Focus
Environmental Information
Project Number
20150776
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Completion Sheet (ESCS) - SWANSEA UNIVERSITY CAMPUS OPTIMISATION
Publication Date
31 Dec 2023
Document language
Main Topic
Lending
Document Number
173231303
Document Focus
Environmental Information
Project Number
20150776
Sector(s)
Regions
Countries
Publicly available
Download now

News & Stories

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications