    Summary sheet

    Release date
    16 March 2021
    Status
    Reference
    Under appraisal | 09/12/2020
    20180271
    Project name
    Promoter - financial intermediary
    CORRIDOR VC TUNNEL PRENJ
    JAVNO PREDUZECE AUTOCESTE FBIH DOO
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 300 million
    EUR 1000 million
    Location
    Sector(s)
    Description
    Objectives

    The project consists of the construction on a new alignment of the 10 km Tunnel Prenj and 24 km of road approaches as part of the Konjic - Mostar North road section on motorway Corridor Vc in central Bosnia and Herzegovina (BiH). The motorway road section is part of the Pan-European Corridor Vc linking Hungary and northeastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of the port of Ploce. The project lies on the indicative extended Trans-European Transport Network (TEN-T) Mediterranean core network. The road section of the project is included in the Single Project Pipeline agreed between the Government of BiH and European Commission as adopted by the BiH National Investment Committee in February 2019. The project road section is also aligned with BiH's Transport Strategy 2016-2030.

    The Corridor Vc motorway connection is essential for fostering economic growth in the country. The project is expected to facilitate trade, develop tourism, promote regional and national economic growth and ultimately contribute to economic and social cohesion in the region. The project will facilitate convergence toward EU standards in terms of the core economic infrastructure of BiH and increase road capacity and safety on this North-South corridor. The project will shorten travel distances along the central part of the corridor and is thus expected to generate substantial benefits in terms of time savings, reduced accident rates, savings in vehicle operating costs and reduction of relative emissions. The project will also increase accessibility and promote regional as well as local economic development.

    Environmental aspects
    Procurement

    If located within the EU, the project would fall under Annex I of the EIA Directive 2014/52/EU amending the EIA Directive 2011/92/EU and therefore be subject to an environmental impact assessment (EIA) procedure. As a potential candidate country to the EU, BiH has adopted the relevant EU Directives, including the EIA Directive (2014/52/EU). The entire Corridor Vc has been subject to a regulatory EIA procedure in BiH (divided in four lots with the corresponding EIAs), including public consultation at scoping and assessment stages. For the road section Konjic-Mostar North, a specific environmental impact assessment and a Waste Management Plan were prepared in 2016 and are currently updated under Western Balkans Investment Framework financed technical assistance (WBIF financed TA). Environmental and social aspects, management measures and procedures as well as alignments of the project with EIB Environmental and Social standards and provisions of the relevant EU Directives are to be reviewed during appraisal.

    The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - CORRIDOR VC TUNNEL PRENJ - Environmental and Social Action Plan
    Publication Date
    12 Mar 2024
    Document language
    Main Topic
    Lending
    Document Number
    191683004
    Document Focus
    Environmental Information
    Project Number
    20180271
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - CORRIDOR VC TUNNEL PRENJ - Non Technical Summary
    Publication Date
    12 Mar 2024
    Document language
    Main Topic
    Lending
    Document Number
    191592100
    Document Focus
    Environmental Information
    Project Number
    20180271
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - CORRIDOR VC TUNNEL PRENJ - Land Acquisition and Resettlement Framework
    Publication Date
    12 Mar 2024
    Document language
    Main Topic
    Lending
    Document Number
    191555671
    Document Focus
    Environmental Information
    Project Number
    20180271
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - CORRIDOR VC TUNNEL PRENJ - Biodiversity Management Plan
    Publication Date
    12 Mar 2024
    Document language
    Main Topic
    Lending
    Document Number
    191596315
    Document Focus
    Environmental Information
    Project Number
    20180271
    Sector(s)
    Publicly available
    Download now
    Stakeholder Engagement Plan (SEP) - CORRIDOR VC TUNNEL PRENJ
    Publication Date
    12 Mar 2024
    Document language
    Main Topic
    Lending
    Document Number
    191682799
    Document Focus
    Environmental Information
    Project Number
    20180271
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - CORRIDOR VC TUNNEL PRENJ - Environmental and Social Impact Assessment Report
    Publication Date
    4 Apr 2024
    Document language
    Main Topic
    Lending
    Document Number
    197245067
    Document Focus
    Environmental Information
    Project Number
    20180271
    Sector(s)
    Publicly available
    Download now
    Other links

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications