Summary sheet

Release date
28 September 2022
Status
Reference
Approved | 08/12/2022
20210192
Project name
Promoter - financial intermediary
ZSR DEVINSKA NOVA VES RAIL LINE - GREEN LOAN
ZELEZNICE SLOVENSKEJ REPUBLIKY
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 194 million
EUR 890 million
Location
Sector(s)
Description
Objectives

Rehabilitation and modernisation of core Trans-European Transport Network (TEN-T) railway infrastructure from Devínska Nová Ves in Slovakia to the borders of Austria and Czech Republic.

The investments will ensure compliance with the applicable TEN-T standards. After rehabilitation and modernisation, it is expected that maximum speeds on the line will increase significantly on the majority of improved sections, from presently 120-140 km/h to up to 200 km/h. Consequently, transport benefits are expected from the removal of bottlenecks, shorter and more reliable travel times, increased safety and improved railway services.

Environmental aspects
Procurement

Where and if applicable, the requirements of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC (to be completed as relevant/applicable) will be verified during appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation and pollution prevention and control.

The Bank will require the Promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation Directive 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Comments

Components of the project have either received or are intending to apply for EU grants - including European structural and investment funds (ESIF), Connecting Europe Facility (CEF) and Recovery and Resilience Facility (RRF).

Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - ZSR DEVINSKA NOVA VES RAIL LINE - GREEN LOAN
Publication Date
13 Dec 2022
Document language
Main Topic
Lending
Document Number
159302002
Document Focus
Environmental Information
Project Number
20210192
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - ZSR DEVINSKA NOVA VES RAIL LINE - GREEN LOAN - Nicht-technische Zusammenfassung
Publication Date
17 Dec 2022
Document language
Main Topic
Lending
Document Number
160580351
Document Focus
Environmental Information
Project Number
20210192
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - ZSR DEVINSKA NOVA VES RAIL LINE - GREEN LOAN - Non technical Summary
Publication Date
17 Dec 2022
Document language
Main Topic
Lending
Document Number
160581037
Document Focus
Environmental Information
Project Number
20210192
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - ZSR DEVINSKA NOVA VES RAIL LINE - GREEN LOAN - Strategic Plan for Transport - Environmental Report
Publication Date
17 Dec 2022
Document language
Main Topic
Lending
Document Number
160580631
Document Focus
Environmental Information
Project Number
20210192
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - ZSR DEVINSKA NOVA VES RAIL LINE - GREEN LOAN - Project Component 4 – DNV-Marchegg (SK/AT) - Elektrifikácia
Publication Date
17 Dec 2022
Document language
Main Topic
Lending
Document Number
165392031
Document Focus
Environmental Information
Project Number
20210192
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - ZSR DEVINSKA NOVA VES RAIL LINE - GREEN LOAN - Project Component 4 – DNV-Marchegg (SK/AT) - Modernisation
Publication Date
20 Dec 2022
Document language
Main Topic
Lending
Document Number
165416999
Document Focus
Environmental Information
Project Number
20210192
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - ZSR DEVINSKA NOVA VES RAIL LINE - GREEN LOAN - Link to SEA Masterplan 2030
Publication Date
20 Dec 2022
Document language
Main Topic
Lending
Document Number
165410834
Document Focus
Environmental Information
Project Number
20210192
Sector(s)
Regions
Countries
Publicly available
Download now
Link to source

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications