    Reference: 20010689
    Release date: 8 April 2002

    Promoter – Financial Intermediary

    Comunidad Autónoma de Navarra

    Location

    Description

    Construction of a shadow toll road between Pamplona and Logroño.

    Objectives

    The project will reduce the traffic congestion at regional level and improve road safety and traffic conditions for transit traffic of the whole area connecting the cities of Pamplona and Logroño.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Approximately EUR 150 m

    Total cost (Approximate amount)

    Estimated cost of EUR 300 m

    Environmental aspects

    The promoter is required to respect the regulations imposed by the Directive 97/11/EC. An Environmental Impact Assessment has been realised. In accordance with its normal procedure, the Bank will ensure that appropriate measures have been taken as regards environmental protection; in particular special measures for impact mitigation have been clearly identified during the design process.

    Procurement

    The project was advertised in the Official Journal of the EU on 15th March 2002 in accordance with Directive 93/37/CEE. It is expected that the concession contract will be awarded before summer 2002.

    Status

    Signed - 17/10/2002

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Spain Transport