    Reference: 20030057
    Release date: 16 June 2004

    Promoter – Financial Intermediary

    Office National de l’Électricité.

    Location

    Description

    The project concerns investment in the Mohammédia power plant located on the coast 25 km north of Casablanca, which was built in the early 1980s by Ansaldo on the basis of an EDF design. The plant has an installed capacity of 600 MW (15% of the country’s electricity) generated by four 150 MW steam turbines (two coal-fired and two heavy-fuel-oil-fired).

    Objectives

    The new schemes aim to reduce the plant’s environmental impact and improve its performance. They will serve to eliminate operational inefficiencies through modification of the boiler design and improvement of coal pulverisation capacity.

    Comments

    Electricity.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 40 million loan from EIB own resources with interest subsidy from the MEDA II budget.

    Total cost (Approximate amount)

    Around EUR 100 million.

    Environmental aspects

    The investments concerning the coal-fired turbines include the requisite equipment to reduce air pollution, recover and process fly and heavy ash, reduce the consumption of regeneration products and separate and treat wastewater.

    Procurement

    The different components of the project have been put out to tender in separate lots in accordance with the Bank’s rules.

    Status

    Signed - 4/11/2004

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Morocco Energy