Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20050462
    Release date: 7 December 2005

    Promoter – Financial Intermediary

    Palestinian Energy and Natural Resources Authority

    Location

    Description

    The project consists of the study, design, supply, erection, commissioning and operation of a number of schemes to improve the quality and reliability of supply, reduce technical and non-technical losses and accommodate fast growing electricity demand.

    Objectives

    The project is expected to result in increased system reliability, a reduction in technical and commercial losses, increased access to electricity, reduced operating and maintenance costs and increased safety for staff and consumers. By helping to meet the growth in demand and re-establish security of supply, the project will contribute to economic regeneration.

    Comments

    Electricity.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 45 million.

    Total cost (Approximate amount)

    EUR 98 million.

    Environmental aspects

    The project is expected to comply with both national standards and international recommendations in the field of environment.

    Procurement

    International procurement, in line with EIB guidelines.

    Status

    Signed - 13/12/2005

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Palestine* Energy