Release date: 20 October 2009
Promoter – Financial Intermediary
Luka Koper Pristaniski in Logisticni Sistem DDLocation
Description
Infrastructure projects in the Port of Koper consisting of:
- Construction of a 146m long new quayside (berth7C) within the PierI Container Terminal.
- Supply and installation of four new cranes for servicing post-Panamax vessels of up to 350m in length within berths 7B (existing) and 7C (new).
- In-filling and paving of hinterland lagoons behind berths 7A and 7B.
- Construction of hinterland storage facilities at berth7C.
- Acquisition of equipment and machinery
Objectives
Loan to support infrastructure projects in the Port of Koper, in particular extension of Pier 1, to increase capacity of the only Sloveniain port located in the northern Adriatic Sea.
Comments
N/A
Sector(s)
Proposed EIB finance (Approximate amount)
EUR 50 million
Total cost (Approximate amount)
EUR 135 million
Environmental aspects
A formal EIA is required in compliance with the EU EIA Directive 85/337/EEC. Compliance with the EIA Directive 2003/35/EC, biodiversity assessment requirements and status of environmental studies, consultations and authorisations will be reviewed during appraisal.
Procurement
Luka Koper d.d. is the contracting authority for design, tender, implementation and supervision of the various project components. The works and the supply of equipment will be realised or installed by private contractors/suppliers on the basis of public tendering (including publication in the OJ of the EU Official Journal, if appropriate) – to be confirmed at appraisal.
Status
Signed - 6/04/2011
Disclaimer
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).