Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20100643
    Release date: 20 June 2011

    Promoter – Financial Intermediary

    Metro Warszawskie Sp. z o. o.

    Location

    Description

    Purchase of 35 new trains for the Warsaw metro, of which 20 will operate on the new line II, and 15 are to increase the service level on the existing line I. The acquisition of the new rolling stock for line II is part of the wider project entitled “Metro Line II in Warsaw – Preparatory Works, Design and Construction of the Central Section with Rolling Stock Procurement”.

    Objectives

    The project, with the acquisition of the new tram vehicles, will improve the quality of public transport service in terms of speed, comfort and reliability and will increase the attractiveness of public transport in the urban area, thus contributing to reduce reliance on private cars and the negative impact of transport on the environment.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to PLN 554 million (ca. EUR 144 million)

    Total cost (Approximate amount)

    Approx. PLN 1 150 million (ca. EUR 299 million)

    Environmental aspects

    The acquisition of new rolling stock does not fall within the scope of the EU Directive 85/337/EEC (as subsequently amended), therefore no EIA is required for the project. The project can be expected to contribute to an overall improvement of the urban environment thanks to the better environmental performances of new vehicles, and by contributing to the promotion of public transport.

    Procurement

    The Promoter is subject to and follows EU procurement procedures (namely, Directive 2004/17/EEC) including publication in the EU Official Journal. The Bank will require the Promoter to ensure that the contracts under the project shall be tendered in accordance with these regulations, including publication of tender notices in the EU Official Journal. Under these circumstances, the procurement procedures applied by the Promoter are suitable for the project and acceptable to the Bank.

    Status

    Signed - 17/12/2012

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Poland Transport