Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20160569
Release date: 4 July 2016

Promoter – Financial Intermediary

EUROPEAN SPALLATION SOURCE ERIC

Location

Description

Construction and operation of a multi-disciplinary research laboratory in Lund, Sweden, based on the world's most powerful neutron source

Objectives

The European Spallation Source (ESS) will create a pan-European research infrastructure that will serve a community of 5 000 researchers across numerous research areas such as new materials (nanomaterials), energy and climate (fuel cells, batteries, biofuels, solar energy and superconductors), health (tissues, proteins, enzymes and other complex biological materials), engineering (catalysers, aeroplane wings, automobile engines), chemistry (environmentally friendly detergents, paints, cleaners and lubricants), or environmental technology (improved knowledge of water treatment and cleaner industrial processes). The ESS is one of the strategic research infrastructure projects under the "Excellent Science" programme of Europe's Horizon 2020 strategy.

Sector(s)

  • Services - Professional, scientific and technical activities

Proposed EIB finance (Approximate amount)

EUR 200 million

Total cost (Approximate amount)

EUR 1843 million

Environmental aspects

The facility will require permits in line with the Swedish Radiation Protection Act, the Swedish Environmental Code and the Swedish Planning & Building Act. Radiation protection and safety will be carefully monitored by the regulatory authorities. The status of the authorisations will be assessed during appraisal of the project. Research infrastructure is not specifically mentioned in Directive 2011/92/EU on environmental impact assessment (EIA), though due to its size, the project could be covered by Annex II of the directive in relation to urban development. The Bank's services will verify during appraisal whether an EIA is required for any component of the project.

Procurement

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/18/EC and Dir. 2007/66/EC), with publication of tender notices in the Official Journal of the EU, as and where required. Procurement issues will be reviewed during appraisal.

Status

Signed - 29/11/2016

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Denmark Sweden Services