Fiche récapitulative
The project comprises schemes for the reinforcement and modernisation of the electricity transmission network in the Czech Republic, over the period 2021-2025.
The project is expected to support the efficient operation of the electricity transmission network in the Czech Republic, to increase the capacity of the electricity transmission network and to enable the Promoter to maintain the reliability and quality of electricity supply.
The project supports the reinforcement and modernization of the electricity transmission network in the Czech Republic. EIB's financing will enable the promoter to implement its investment programme and to support the efficient operation of the network in a context of increasing transit and loop flows. The project will support improved quality of service, reliability and security of supply that have public good attributes and will enable the integration of RES generation, in line with national and EU policies and targets. In line with the EU Taxonomy, electricity grid infrastructure in Europe is considered eligible for climate change mitigation. The financing of this project is in line with the Bank's lending priority objectives on Energy as well as the transversal objectives on Climate Action, Environmental Sustainability and Social and Economic Cohesion. The project is expected to deliver fair economic benefits and good social benefits. The promoter is experienced in works of this nature and has a sound project management system in place. The Client will benefit from the flexibility of the EIB financing enabling the optimization of their cash flow needs. The pricing, availability period as well as longer grace period add to attractiveness of the mutual co-operation.
The project comprises electricity transmission schemes (overhead lines and works in existing substations), some of which will fall under Annex I of the Environmental Impact Assessment (EIA) Directive and will have to undergo an obligatory environmental impact assessment, while most of the schemes will fall under Annex II, thus requiring the competent national authority to determine the need for an EIA. The main impacts that can typically be expected for a project of this nature relate to visual impact, vegetation clearance, electromagnetic fields, noise nuisance, impact on flying vertebrates and disturbance during construction.
The Bank will require that the Promoter ensure that contracts for the implementation of the Programme schemes have been tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union, as and where required.
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).
Documents
À la une
Informations et observations générales
La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.
Informations aux médias
Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.
Mécanisme de traitement des plaintes
Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.
Tolérance zéro face à la fraude et à la corruption
La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.
Publications connexes