Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    35 440 000 €
    Pays
    Secteur(s)
    Roumanie : 35 440 000 €
    Services : 10 277 600 €
    Éducation : 25 162 400 €
    Date(s) de signature
    17/06/2024 : 10 277 600 €
    17/06/2024 : 25 162 400 €
    Lien vers la source

    Fiche récapitulative

    Date de publication
    8 juillet 2024
    Statut
    Référence
    Signé | 17/06/2024
    20220866
    Nom du projet
    Promoteur – Intermédiaire financier
    IASI UNIVERSITY OF MEDICINE AND PHARMACY
    UNIVERSITATEA DE MEDICINA SI FARMACIE GRIGORE T. POPA IASI
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 35 million
    EUR 71 million
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project concerns the construction and refurbishment of a number of facilities on the university campus of the Grigore T. Popa Medicine and Pharmacy University of Iasi.

    The project will finance the construction, extension, renovation and rehabilitation of university premises in Romania. The main objective is to provide better learning conditions for students, as well as improved working and research conditions for university staff, by creating additional capacity in academic and research buildings and by renovating existing spaces that are no longer fit for purpose. These investments are also aimed at adapting infrastructures to new technologies, providing additional or modernised student accommodation, improving accessibility for people with disabilities, and also improving the energy efficiency of buildings. All building construction and renovation projects will be energy efficient and will follow energy efficiency standards. The final beneficiaries for this project are current and future students, as well as university staff.

    Additionality and Impact

    The Project addresses a sub-optimal situation with regard to investments in higher education infrastructure in Romania. Public higher education has the nature of a public good for which the operator cannot capture sufficient financial benefits, justifying public intervention. The Project also addresses a market failure with regard to the financing of infrastructure for early-stage R&D activities performed in public higher education institutions. The markets fail to provide adequate funds for early-stage R&D because of the uncertainty inherent in these activities and because of knowledge spillovers, which reduce the appropriability of economic returns. The Project will create new space for teaching and research, will invest in modern educational equipment, and will provide modern accommodation and support infrastructure for students at University of Medicine and Pharmacy "Grigore T. Popa". These measures can be expected to increase the quality and relevance of higher education and research in Romania's North-East region and contribute to increasing the region's capacity to innovate. The Project also addresses the need for energy efficiency upgrades of several faculty buildings. EIB involvement is expected to crowd in further funding for University of Medicine and Pharmacy "Grigore T. Popa". The University benefitted from the support of the InvestEU Advisory for Social Infrastructure and Service (technical and financial advisory from internal experts and external consultants).

    Aspects environnementaux
    Passation des marchés

    The Directive 2011/92/EU amended by 2014/52/EU does not specifically mention the need for an Environmental Impact Assessment (EIA) for buildings relating to education, but it may be that some sub-projects can be regarded as urban renewal projects (Annex II of the European Directive). This will be verified for each sub-operation during the appraisal. Directive 2010/31/EU amended in 2018 by Directive (EU) 2018/844 on the Energy Performance of Buildings will be checked during appraisal for each component on a case-by-case basis.

    The Bank will require the Promoter to ensure that contracts for the implementation of the project shall be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Milestone
    À l'examen
    Approuvé
    Signé
    27 octobre 2023
    17 juin 2024
    Projets associés
    Lien vers la source

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes