Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
35 000 000 €
Pays
Secteur(s)
Lituanie : 35 000 000 €
Énergie : 35 000 000 €
Date(s) de signature
12/09/2024 : 35 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
23 mai 2024
Statut
Référence
Signé | 12/09/2024
20230620
Nom du projet
Promoteur – Intermédiaire financier
KAUNAS DISTRICT HEATING UPGRADE
KAUNO ENERGIJA AB
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 35 million
EUR 70 million
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The operation consists of the financing of a three-year investment programme concerning the upgrade and extension of the district heating networks in Kaunas city and several other, smaller municipalities, including the modernisation of existing and construction of new heat generation assets.

The objectives are to maintain and expand the district heating systems, decrease distribution losses and improve the reliability of heat supply through the modernisation and extension of the grids, and installation of new and modernisation of existing renewable heat generation units.

Additionality and Impact

The Project contributes to the InvestEU objective of the development of the energy sector in accordance with the Energy Union priorities. EIB financing will allow the promoter to upgrade and extend the heating network and install new and modernise existing renewable heat generation assets located in Kaunas city and Kaunas district municipalities in Lithuania. The project contributes to the decarbonisation objectives as stated in the National Energy and Climate Plan for Lithuania which sets a 90% biomass target for the district heating sector by 2030.

The financing of this project will contribute to EU and Bank's priority objectives on energy, on climate action and cohesion priority regions. Such investment is crucial to improve security, energy efficiency and flexibility of heat supply and meet existing and future demand for heat and hot water. The project addresses number of market failures: Low-carbon heat projects reduce carbon and air pollution externalities, low-carbon technologies contribute also towards increasing security of supply by reducing dependency on imported fossil-based energy. Security of supply can be considered as a public good.

The project is expected to have an excellent economic justification, excellent rated broader social benefit and generate additional employment in construction. The capacity of the promoter is considered appropriate for the proposed project.

The EIB loan plays a key role in ensuring the funding of the project. The long tenor of the EIB loan (15 years) is well in line with the economic life of the underlying heating assets and it is perfectly suited to finance investments with long payback period such as the Project implemented by the promoter. The funding of similar maturities is not available on the Lithuanian debt market. Customised terms such as flexible drawdown over the long availability period are of value to the promoter because of the multiannual Project's implementation period. The EIB involvement will send a strong signalling effect to the commercial banks that EIB is standing by to support the decarbonisation of the Lithuanian heating sector. EIB would not be able to provide such type of financing, or not at the same quantum, without the support of InvestEU.

Aspects environnementaux
Passation des marchés

The investment programme includes numerous sub-operations from installation of biomass-fired boilers to the modernisation and extension of district heating grids. As such, it may include components that fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU as amended by Directive 2014/52/EU), which requires the competent national authority to determine the need for an EIA. The investments are expected to have limited environmental impact, at this stage the promoter does not expect any EIA requirements for the investments. The environmental and social due diligence will focus on the Promoter's capacity to implement the program in line with the EIB's environmental and social standards and requirements. As the project includes the investment in biomass-fired boilers among other schemes, the assessment will concern also the sustainability of biomass.

The promoter has to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU, as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
À l'examen
Approuvé
Signé
24 juillet 2024
12 septembre 2024
Lien vers la source
Fiche récapitulative

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - KAUNAS DISTRICT HEATING UPGRADE
Date de publication
13 Aug 2024
Langue
Sujet général
Prêts
Numéro du document
210651579
Thématique du document
Information Environnementale
Numéro du projet
20230620
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes