Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20030204
    Date de publication: 24 octobre 2003

    Promoteur – Intermédiaire Financier

    Communauté Urbaine de Lyon (Greater Lyons)

    Lieu

    Description

    The project involves the restructuring and modernisation of the drinking water supply and sewage treatment systems of Greater Lyons. In particular, it includes:

    • the upgrading and enlargement of the Pierre-Bénite sewage treatment plant and construction of the Jonage plant;
    • the reorganisation and modernisation of the sewerage system;
    • the protection of drinking water resources and creation of secondary resources;
    • the first phase of water main replacement (total length of network 3 600 km) to ensure compliance with the new EU standards on drinking water quality. The extension of the Pierre Bénite sewage treatment plant, the main component of the operation, represents France's largest sanitation project (outside the Paris conurbation) for the years ahead.

    Objectifs

    Restructuring and modernisation of the drinking water supply and sewage treatment systems of the Lyons conurbation.

    Commentaires

    Environment.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 150 million

    Coût total (montant approximatif)

    EUR 328 million

    Aspects environnementaux

    The project will help to significantly improve the living conditions of the population and alleviate the environmental impact of Greater Lyons. Certain components of the project (enlargement of the treatment plant, incinerator) may fall within Annex I or II of Directive 97/11/EC amending Directive 85/337/EEC on environmental impact assessment. These components will be examined at the project appraisal stage. Respect for any protected natural areas will also be examined in the course of the project appraisal, as will the application of the water resource development and management plan in the project area and the implementation of the EU water framework directive.

    Passation des marchés

    The tendering procedures accord with the relevant EU directives and will be discussed with the promoter in the course of the project appraisal.

    Statut

    Signé - 3/12/2003

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    France Énergie