    Référence: 20040255
    Date de publication: 11 avril 2005

    Promoteur – Intermédiaire Financier

    Kenya Electricity Generating Company Ltd. (KenGen)
    Contact: Mr Simon Ngure, Team Leader, Project Implementation Team

    Lieu

    Description

    Extension of the powerhouse, substation and switchyard of the existing 70 MW geothermal station and installation of a third steam turbine and generator set of 35 MW capacity. The project includes steamfield development, of which the drilling and fitting out of geothermal and re-injection wells is already complete.

    Objectifs

    The project is aimed at enhancing the use for electricity production of underground steam, an indigenous renewable source of energy, in order to meet the growing demand for electricity in Kenya on a least cost basis.

    Commentaires

    Electricity generation

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Loan in an amount of up to EUR 32.5 million.

    Coût total (montant approximatif)

    Estimated at EUR 68 million.

    Aspects environnementaux

    The main environmental impacts are land use and visual; condensed steam effluents will be re-injected into the steam reservoir. The findings of the Environmental Impact Assessment for the existing plant, established in 1994 in accordance with national regulation, are still valid; an update was made in 2004 for the extension project and is being submitted to the relevant Kenyan Authority (NEMA) for approval. The EIB will monitor the implementation of recommended environmental action.

    Passation des marchés

    The promoter has launched open tendering procedures for consultancy services, with publication of the prequalification notice in the OJEU and other media. Similarly, publication of the invitation for tenders for the turnkey contract, covering the majority of works and supplies, is planned for May 2005.

    Statut

    Signé - 31/05/2005

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Kenya Énergie