Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20050539
    Date de publication: 14 mars 2007

    Promoteur – Intermédiaire Financier

    The project concerns the construction of a second container terminal at the port of Tangiers-Med, developed by the TMSA port authority. This concession project includes, in particular, the construction and equipping of a quay for container vessels and the creation of a handling and storage area.

    Lieu

    Description

    The project will help to continue the development of the Tangiers-Med port, which is strategically located on the Strait of Gibraltar. This project will have an economic impact both at the regional level through the creation of a facility serving international maritime transport, and at the local level by contributing to the economic development of the northern regions of Morocco.

    Objectifs

    Transport project of regional benefit.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 40 million.

    Coût total (montant approximatif)

    EUR 137 million.

    Aspects environnementaux

    The Bank's 2004 Environmental Statement stipulates that "the EIB ensures that all projects it finances ... comply with the EU's Directive on Environmental Impact Assessment". Within the Union, the project would be considered as part of a larger port project which would fall under Annex I to Directive 85/337/EEC (as amended). A formal Environmental Impact Assessment would therefore be required. Consequently, the Bank will have to verify during its project appraisal procedure whether the environmental studies and public consultation are in line with the principles of the EU directives and whether Morrocan law meets EU environmental requirements.

    Passation des marchés

    The Bank will check with the promoter that the project is implemented in accordance with the Bank's Guide to Procurement. TMSA is a public organisation and would therefore be subject to the recommendations of the guide on public-sector operations. The Bank's staff will ensure during the project apprasial that the call for tenders for the concession has been subject to broad international consultation (this appears to be the case, at least during the initial phases of the procurement procedure). In the subsequent negotiation phases of the contract award, the Bank will verify that competition principles have been satisfactorily upheld.

    Statut

    Signé - 24/06/2008

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Maroc Transports