Référence: 20070095
Date de publication: 21 février 2008

Promoteur – Intermédiaire Financier

T.E.R.NA. – Trasmissione Elettricità Rete Nazionale S.p.A., the transmission system operator in Italy and the owner of the National Transmission Grid (NTG) for high voltage electricity.

Lieu

Description

The project concerns the design, construction and operation of a new submarine high voltage direct current electricity cable link between the Italian mainland and Sardinia with a capacity of 1,000 MW and a total submarine section length of 420 km, plus two short land sections and two converter stations.

Objectifs

The project will help to export excess power from future wind farms and possibly from thermal power plants from Sardinia for meeting growing electricity demand in mainland Italy, and maintain/improve the reliability of the grid supply system on Sardinia, one of Italy’s less developed regions.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 300 million

Coût total (montant approximatif)

Indicatively EUR 700 million

Aspects environnementaux

The project does not fall under the EU EIA Directive since it concerns a submarine/underground cable. The promoter submitted a detailed Environmental Impact Assessment report covering in particular the aspects of installation of the submarine cable and its possible effects on marine life. The competent authorities, comprising national and regional bodies, having examined the environmental impact study provided by the promoter, confirmed the environmental compatibility of the planned installation imposing a number of detailed mitigating measures to be taken during construction and operation.

Passation des marchés

The promoter is subject to the requirements of the EU Procurement Directive 93/38/EC (as amended by 2004/17/EC) and plans to let a further series of contracts via OJ publication; three contracts have already been let via OJ publication.

Statut

Signé - 5/05/2008

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).