Date de publication: 25 février 2009
Promoteur – Intermédiaire Financier
Piraeus Port Authority S.A.
Lieu
Description
The project comprises the upgrading and expansion of the Pier I of Piraeus Port, at the Ikonion Container Terminal in Attica region, to provide extra capacity (estimated at 1.3 twenty foot equivalent - TEU per year) to accommodate future traffic growth.
Objectifs
Piraeus Port is the largest port in Greece with a vital position operating both as a port for the wider area of Greece, as well as for the Balkans and Black Sea countries.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 46 million.
Coût total (montant approximatif)
EUR 93.50 million.
Aspects environnementaux
The project falls entirely within the existing harbour and an EIA was carried out for the Port Master Plan including the container terminals. The Project is an upgrade and increase in scope of the earlier Port of Piraeus II project and as such would fall under Annex II of the EIA Directive. The Promoter has informed the Bank that the competent authority has determined that no further environmental studies or EIA are required for the increased project scope. No Habitats or biodiversity impacts are expected from the change in scope. The changes in Environmental impacts related to the change in scope are expected to be minor. These matters will be verified during appraisal.
Passation des marchés
The project is an upgrade and increase in scope of the earlier Port of Piraeus II project, the works for which were awarded under a contract with a tender advertised in the OJEU. The procurement for these works falls under the EU Utilities Directive and the increased scope of works which are necessary for the completion of the works have been awarded to the original contractor following a legal determination in Greece that such award of extra works complies with Greek and hence EU public procurement law. These matters will be verified during appraisal.
Statut
Signé - 25/06/2009
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).