    Référence: 20080296
    Date de publication: 10 septembre 2009

    Promoteur – Intermédiaire Financier

    Public Power Corporation S.A. (PPC)

    Lieu

    Description

    The project consists of a 4-year investment programme (2008-2011) aimed at reinforcing and extending the promoter’s transmission and distribution electricity networks throughout Greece.

    Objectifs

    The project will promote the development of the transmission and distribution electricity networks in Greece. The project will enable the promoter to cater for demand growth, to improve the quality and the reliability of supply and to support the connection and the efficient exploitation of traditional and renewable generation resources.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Under appraisal.

    Coût total (montant approximatif)

    Under appraisal.

    Aspects environnementaux

    Some schemes of the project involving long 400 kV overhead lines will fall under Annex I of the EIA Directive 85/337/EEC, as amended, while the remainder will fall under ANNEX II, leaving it to the national competent authority to decide whether an EIA would be required in line with the screening criteria specified in the directive. However, many project schemes are expected to be distribution reinforcements that will not require formal EIAs and will have minimal or no environmental impact.

    The impacts that can be typically expected for the project schemes relate to visual impact, vegetation clearance, electromagnetic fields, noise nuisance, and disturbance during construction. The EIA screening criteria applied by the national competent authority in Greece and the provisions for biodiversity assessment of projects will be investigated during appraisal.

    Passation des marchés

    EIB will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation, including publication of tender notices in the Official Journal of the EU as and where appropriate.

    Statut

    Signé - 15/12/2009

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Grèce Énergie