Date de publication: 29 avril 2010
Promoteur – Intermédiaire Financier
Société Tunisienne de l’Electricité et du Gaz (STEG)
Lieu
Description
The project concerns the construction of a single-shaft combined-cycle power plant with a capacity of around 400 MW in Sousse.
Objectifs
The primary objectives of the Sousse power plant are:
- to upgrade electricity generating capacity in order to meet growing demand, ensure the network's balance and support the country's economic development;
- to deploy combined-cycle technology (gas turbine with steam cycle) to increase the thermal efficiency of the system by improving the output and reducing greenhouse gas emissions and polluants.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 194 million from the Bank's own resources under the ENP/MED Mandate (2007-2013).
Coût total (montant approximatif)
Approximately EUR 388 million.
Aspects environnementaux
A preliminary study of the environmental impact assessment (EIA) of the project was produced in accordance with current Tunisian legislation. The promoter complied with the Bank's requirements, in particular with regard to the public consultation of the communities affected by the project.
Passation des marchés
Having carried out the previous projects, the promoter is fully familiar with the Bank’s procurement procedures and issues international calls for tender.
Statut
Signé - 11/12/2010
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).