Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20130278
Date de publication: 27 septembre 2013

Promoteur – Intermédiaire Financier

MAV MAGYAR ALLAMVASUTAK ZRT

Lieu

Description

Designed as a framework loan, the project will support rehabilitation, modernisation and upgrading of existing conventional rail infrastructure in Hungary within its investment programme for 2013-2016.

Objectifs

It will contribute to the sustainable transport objective in a cohesion country by improving the efficiency, comfort and safety of the railway system and thus enhancing the attractiveness of this sustainable mode of transport.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 250 million

Coût total (montant approximatif)

EUR 550 million

Aspects environnementaux

The project is an investment programme, hence the need for an EIA may vary according to each scheme. Nevertheless, based on the nature of works most schemes are not expected to be subject to an EIA process. The Promoter’s environmental capabilities will be checked during appraisal. The project is expected to have positive impacts on environment by contributing to a modal shift from road to rail transport and to maintain railway transport attractiveness and competitiveness.

Passation des marchés

The Promoter is subject to and follows public procurement rules according to EU and national regulations. The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (in this case Directives 2004/17/EC and 2007/66/EC), with publication of tender notices in the EU Official Journal. The Promoter’s procurement procedures will be checked during appraisal.

Statut

Signé - 23/12/2013

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Hongrie Transports