Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20130441
Date de publication: 11 juin 2014

Promoteur – Intermédiaire Financier

SPECIAL PURPOSE ENTITY(IES)/FUND

Lieu

Description

Indirect risk sharing instrument to be used to cover up to 50% of the credit risk associated with a portfolio of loans outstanding on DZ Bank AG (DZ) balance sheet. With the resources made available by the guarantee, DZ will undertake to grant new loans to eligible renewable energy projects. The new loans will not be covered by the risk sharing instrument.

Objectifs

This operation will be set up as a risk sharing instrument covering a portfolio of renewable energy assets. The instrument is designed to facilitate the intermediary to undertake new projects.

Commentaires

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 125 million

Coût total (montant approximatif)

EUR 600 million

Aspects environnementaux

The project comprises a multi-sector multi-scheme operation. All of the schemes are expected to fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU. Should any scheme have a negative impact on an area forming part of the Natura 2000 network (as defined under Habitats Directive 92/43/EEC and the Birds Directive 79/409/EEC), then the Bank would require the financial intermediary and the final beneficiary to act according to the provisions of the aforementioned directives as transposed in the national law.

Passation des marchés

The Bank will require the financial intermediary to ensure that contracts for the implementation of the schemes have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EEC/ or 2004/17/EEC and Dir. 2007/66/EC), with parallel publication of tender notices in the EU Official Journal, as and where appropriate.

Statut

Signé - 29/07/2015

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Allemagne Énergie