Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150773
    Date de publication: 19 avril 2017

    Promoteur – Intermédiaire Financier

    JAVNO PREDUZECE AUTOCESTE FBIH DOO

    Lieu

    Description

    Construction of about 20.9 km motorway between Pocitelj and Mostar in the Southern part of Bosnia and Herzegovina.

    Objectifs

    The project is part of the trans-European Corridor Vc, which connects the Croatian coast to Budapest through Bosnia and Herzegovina and forms part of the South-Eastern axis of the extension of the TEN-T network to neighboring countries. Corridor Vc is the main north-south corridor running through Bosnia and Herzegovina. The project is expected to facilitate trade, develop tourism, promote regional and national economic growth and ultimately contribute to economic and social cohesion in the region. The project is therefore eligible under Art 309 (c).

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 144 million

    Coût total (montant approximatif)

    EUR 227 million

    Aspects environnementaux

    If located in the EU, the project, consisting of the construction of a new Greenfield motorway, would fall under Annex I of the EIA Directive 2011/92/EU and therefore require a full Environmental Impact Assessment (EIA) including public consultations. In the Federation of Bosnia and Herzegovina it falls under the EIA procedure as stipulated by the Law on Environmental Protection and pertaining regulation of Bosnia and Herzegovina. The promoter has already provided an EIA study for the project carried out in accordance to the above-mentioned legal framework. Its content and compliance with the principles of the relevant EU directives on SEA, EIA and Nature conservation will be reviewed during appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's guide to procurement and the relevant applicable EU public procurement rules.

    Statut

    Signé - 26/04/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Bosnie-et-Herzégovine Transports