Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20160527
Date de publication: 15 juin 2017

Promoteur – Intermédiaire Financier

ACCEPTABLE CORPORATE(S)

Lieu

Description

A framework loan of up to USD 200 m to part-finance renewable energy projects in India

Objectifs

This operation concerns a framework loan to support the construction and operation of solar photovoltaic (PV) power plants and wind farms in India. The exact schemes to be financed remain to be finally agreed and are expected to be located in various Indian states. The operation contributes to the addition of clean, renewable energy generation to a power system that it is dominated by coal-fired generation and suffers from significant capacity shortages.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

USD 200 million (EUR 170 million)

Coût total (montant approximatif)

USD 400 million (EUR 340 million)

Aspects environnementaux

The operation will focus on PV projects and wind farms with in principle limited environmental and social impact. The Bank will require the promoter to ensure that implementation of the projects will be done in accordance with the Bank's environmental and social standards.

Passation des marchés

The project may include wind farm allocations that would be subject to a local assembly requirement related to the wind turbine nacelles. The required local component appears to be well below the level at which parts can naturally be sourced locally and at economic prices. A more detailed assessment will be performed by the Bank during appraisal, verifying that the project meets the Bank's criteria of economy and efficiency.

Statut

Signé - 31/01/2018

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Inde Énergie