Date de publication: 13 juillet 2018
Promoteur – Intermédiaire Financier
ARCTIC SALieu
Description
The project concerns the construction and ramp-up in two stages of a large-scale green-field washing machine production plant featuring advanced manufacturing technologies. At completion in 2019, the factory is expected to produce some 2.2 million units/year, allowing the promoter to fill the gap between the currently installed capacity and future expected demand. The final products are meant for the European market and would substitute products sold under the same brand but currently produced in the Turkish factories of the same Group.
Objectifs
The proposed project aims at strengthening the local value-added of a Romanian white goods company mainly serving the European market. In view of the less developed status of the Romanian region of South-Muntenia, the investment aims at supporting the structural development of the local private sector in terms of industrial know-how and competitiveness, leading to increased prosperity and reduced economic and social disparities within the region.
Secteur(s)
- Industrie - Industrie manufacturière
Montant BEI envisagé (montant approximatif)
EUR 68 million
Coût total (montant approximatif)
EUR 138 million
Aspects environnementaux
The investment concerns the construction of industrial buildings and infrastructures, as well as machinery and equipment necessary for production. As such, the project falls under Annex II of the Directive 2014/52/EU amending the Environmental Impact Assessment (EIA) Directive 2011/92/EU being an "industrial estate development". The local competent authority has requested an EIA and Appropriate Assessment (AA), which have been carried out by the promoter including a public consultation. The Bank will review in detail the relevant environmental and social aspects during the appraisal processes.
Passation des marchés
The promoter is a private company, not operating in the utilities sector and does not have the status of a contracting authority; thus the project is not covered by the EU directives on procurement.
Statut
Signé - 13/07/2018
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).