Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180092
    Date de publication: 22 octobre 2018

    Promoteur – Intermédiaire Financier

    MINISTERE DU CADRE DE VIE ET DU DEVELOPPEMENT DURABLE - REPUBLIQUE DU BENIN

    Lieu

    Description

    The project consists of the financing of a storm water retention pond as well as disposal infrastructures in the city of Cotonou, Benin.

    Objectifs

    The proposed operation aims at the extension and upgrade of the storm water drainage system in the city of Cotonou. Thereby the operation will support sustainable growth and improve wellbeing and health and environment outcomes. The proposed operation is fully aligned with the Cotonou Agreement and it is eligible under Article 309 point (a) projects for developing less-developed regions and/or point (c) common interest. It is also in line with the government action programme (PAG) spanning 2016-2021 that aims at improving the living conditions of Benin, to create jobs and to revive the economy sustainably.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 50 million

    Coût total (montant approximatif)

    EUR 128 million

    Aspects environnementaux

    The project will have a positive impact on public health by reducing the flooding of houses and the stagnation of rainwater in urban areas. Inside the EU, the project components would be categorised under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/20/EU and therefore would be subject to environmental screening to define if an EIA would be required according to the relevant competent authority. In most cases, wastewater networks in urban areas are screened out. The Bank will assess the social aspects of the project during appraisal to ensure adherence to its social standards. Climate change aspects will be futher examined during the appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will b done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 19/12/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Bénin Eau, assainissement