Date de publication: 24 janvier 2020
Promoteur – Intermédiaire Financier
STATE ENTERPRISE BORYSPIL INTERNATIONAL AIRPORTLieu
Description
The project comprises the delivery of the initial phase of Kyiv Boryspil Airport (KBP) capital investment plan. It consists of a number of infrastructure enhancements at KBP designed to ensure that the highest levels of aviation safety and security are preserved and strengthen its operational resilience. Major works include the rehabilitation of the western airfield system, including the western runway (18R-36L), which has been operating for more than 50 years and is in poor condition, the associated parallel taxiway, the airfield ground lighting and the instrument landing systems, plus a range of other associated airside infrastructure works.
Objectifs
The project is designed to strengthen the airport's operational resilience and ensure that the highest levels of aviation safety and security are preserved. Major works include the rehabilitation of the western runway (18R-36L), plus a range of other associated airside infrastructure works.
Commentaires
This operation is covered by the EU Guarantee for EIB loans outside the EU.
Secteur(s)
- Transports - Transports et entreposage
Garantie au titre du MPE
This operation is covered by the ELM Guarantee.
Montant BEI envisagé (montant approximatif)
EUR 270 million
Coût total (montant approximatif)
EUR 351 million
Aspects environnementaux
If situated in the EU, the new runway construction component would fall under Annex I of the EIA Directive 2011/92/EU requiring a full Environmental Impact Assessment (EIA). The environmental process followed for the individual project components and the compliance with the Bank's environmental and social standards will be assessed during the project appraisal.
Passation des marchés
The Promoter has to ensure that any procurement procedures are done in accordance with the EIB's Guide to Procurement and the relevant applicable EU public procurement rules.
Statut
Signé - 12/02/2021
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).