Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20210696
    Date de publication: 15 juin 2022

    Promoteur – Intermédiaire Financier

    BALTIC POWER SP ZOO

    Lieu

    Description

    Development, construction and operation of a very large-scale (up to 1.2 GW) offshore windfarm in the Polish Economic Exclusive Zone in the Baltic Sea, located 23 km to the north of the Polish coastline. The Promoter is a joint venture of PKN ORLEN (Poland) and Northland Power (Canada).

    Objectifs

    The project should foster the integration of mature variable renewable generation technologies in the market. The Bank's financing would thus fill a market gap in the development of new renewable capacity: that would include a financing gap for projects that try to develop new capacity with more market-exposed structures and instruments.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    PLN 3112 million (EUR 655 million)

    Coût total (montant approximatif)

    PLN 16001 million (EUR 3365 million)

    Aspects environnementaux

    Wind farms adhere to the national legislation having transposed Annex II of Directive 2014/52/EU amending Directive 2011/92/EU, thereby leaving it to the competent authority to determine if an environmental impact assessment (EIA) is mandated. Given the project size, the competent authority required an EIA to be conducted. Compliance of the authorisation process with relevant EU Directives will be verified during appraisal.

    Passation des marchés

    It is provisionally understood that the Promoter, which is a Special Purpose Vehicle (SPV), is neither a contracting authority nor a public undertaking in the sense of the EU procurement policies. It also does not see to operate on the basis of special or exclusive rights granted by a competent authority in relation to this project. Consequently, no public procurement would be required. This needs to be confirmed during appraisal.

    Statut

    Signé - 14/09/2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Énergie