Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20220523
Date de publication: 13 octobre 2022

Promoteur – Intermédiaire Financier

ARAB REPUBLIC OF EGYPT

Lieu

Description

The project will support Egypt in building resilience towards food shortages due to climate change or to food price spikes, by increasing and modernising their cereal storage and logistics infrastructure.

Objectifs

In particular, the operation aims at: (i) strengthening the resilience of Egypt's food supply system by increasing the storage capacity for wheat in modern silos, thus reducing losses in grain storage and handling ; (ii) contributing to immediate food security by addressing cereal supply shortages and replenishing the country's strategic reserves.

Commentaires

The proposed operation is expected to be covered by the comprehensive guarantee granted to EIB under the Dedicated Investment Window 1

Secteur(s)

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Montant BEI envisagé (montant approximatif)

EUR 150 million

Coût total (montant approximatif)

EUR 300 million

Aspects environnementaux

The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation, which will be determined as part of the due diligence. Issues related to occupational health and safety of workers within the value chain will be assessed. The Promoter will have to comply with relevant EIB standards (notably 8-9 Labour rights and Occupational and Public Health, Safety and Security). The project will contribute towards social inclusion given the targeting of the subsidised bread program to reach the vulnerable population of the country.

Passation des marchés

The promoter has to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement.

Statut

Approuvé - 14/12/2022

Milestone
À l'examen
Approuvé
14 décembre 2022

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Égypte Agriculture, pêche, sylviculture