Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20230186
    Date de publication: 10 octobre 2023

    Promoteur – Intermédiaire Financier

    AGENCE NATIONALE D'APPROVISIONNEMENT EN EAU POTABLE EN MILIEU RURAL,SOCIETE NATIONALE DES EAUX DU BENIN

    Lieu

    Description

    The project comprises the construction in Benin of 38 multi-village rural water supply schemes in the Atacora and Donga departments, as well as the extension of the water supply system of the city of Djougou, in the Atacora department.

    Additionality and Impact

    By constructing in Benin 38 multi-village rural water supply schemes and by extending one urban water supply system, the project renders a high economic and social impact in terms of better public health / enabling economic environment, as well as through increased work/school attendance and gender equality. The project falls within the priorities of Benin's national development plan spanning 2018-2025 and with Benin's Government Action Plan 2021-2025.The project is in line with the priorities laid out in the European Commission's Multi-annual indicative programme (MIP) 2021-2027 for Benin. The project will indeed contribute to the development of basic infrastructures in Northern Benin. Basic infrastructure is a necessary condition for maintaining peace and security, which is the objective c) of indicative sector 3 of the MIP. It is fully in line with the EIB Water Sector Lending Orientation and the EIB's operational strategy of supporting the development of social and economic infrastructure in Sub-Saharan Africa and with the priorities of the NDICI - Global Europe Mandate, which include reducing inequalities and supporting human development, the environment and the fight against climate change. The project is also aligned with Sustainable Development Goal #6 (which calls for ensuring availability and sustainable management of water and sanitation for all).

    The project will contribute to support economic growth and environmental sustainability by improving reliability and continuity of water supply services, increasing resilience to climate change and ensuring good health of the population in the beneficiary areas. The Bank's and the EU's contribution to the project is fundamental and complements the earlier interventions of the Bank in the water sector in Benin alongside other financiers. The EIB loan will provide favourable financing terms and conditions including long availability and grace periods. The project will comply with the Bank's high standards.

    Objectifs

    The general objective of the operation is to support the Government of Benin's Action Plan 2021-2026 and its goal of ensuring universal access to water. The project will increase access to water supply services by improving reliability and continuity of water supply services, increasing resilience to climate change and ensuring good health of the population in the beneficiary areas.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Montant BEI envisagé (montant approximatif)

    EUR 62 million

    Coût total (montant approximatif)

    EUR 134 million

    Aspects environnementaux

    The project's compliance with the applicable national environmental legislation and the EIB's environmental and social principles will be respected, as will the Promoters' procedures for impact assessment and environmental monitoring.

    Passation des marchés

    Implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 29/12/2023

    Milestone
    À l'examen
    Approuvé
    Signé
    24 novembre 2023
    29 décembre 2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Bénin Eau, assainissement