Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20240153
Date de publication: 22 août 2024

Promoteur – Intermédiaire Financier

BIK BREITBANDINITIATIVE KARNTEN GMBH

Lieu

Description

Roll-out of public Fibre-to-the-Home (FFTH) network in the Southern part of Austria.

Objectifs

The objective of the project is to provide the passive infrastructure to cover around 22 000 households (HHs) in 40 municipalities in areas where private operators are not providing Very High Capacity (VHC) services due to lack of commercial interest. The network will be deployed in a point-to-point Fibre-to-the-Home (FTTH) configuration and will be commercialised through operators in charge of providing the active service to the final retail operators. The passive infrastructure included in the project will allow for 3 such operators to provide active service on an open access basis to the retail operators.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 110 million

Coût total (montant approximatif)

EUR 220 million

Aspects environnementaux

Investments in fixed telecommunications projects (mainly civil works for fibre rollout) do not fall under the Annexes of the EIA Directive 2014/52/EU amending Directive 2011/92/EC. The related works have limited environmental effects, apart from disturbances during civil work construction, which can be mitigated by appropriate measures. Where and if applicable, the requirements of the environmental impact assessment Directive and the requirements of social standards will be verified during appraisal.

Passation des marchés

The Bank will require the Promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation Directive 2014/24/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

Approuvé - 5/09/2024

Milestone
À l'examen
Approuvé
5 septembre 2024

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Autriche Télécom