66 939 828,49 €
Pays
Secteur(s)
Pologne : 66 939 828,49 €
Énergie : 66 939 828,49 €
Date(s) de signature
13/01/2022 : 170 839,71 €
13/01/2022 : 509 248,03 €
13/01/2022 : 582 879,57 €
13/01/2022 : 651 556,62 €
13/01/2022 : 834 192,15 €
13/01/2022 : 1 124 226,54 €
13/01/2022 : 2 609 064,84 €
13/01/2022 : 8 605 398,03 €
13/01/2022 : 9 592 357,31 €
13/01/2022 : 10 945 941,23 €
13/01/2022 : 12 835 254,95 €
13/01/2022 : 18 478 869,51 €
Lien vers la source

Fiche récapitulative

Date de publication
14 avril 2023
Statut
Référence
Signé | 13/01/2022
20200453
Nom du projet
Promoteur – Intermédiaire financier
EDPR POLAND GREEN ENERGY LOAN
EDP RENOVAVEIS SA
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
PLN 304 million (EUR 66 million)
PLN 2341 million (EUR 512 million)
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The project concerns the construction and operation of 11 small to medium-scale wind farms (for a total nominal capacity of 380 MW) to be located throughout the west and the north of Poland.

The development of onshore wind energy supports the EU and national targets for renewable energy generation and contributes to the EIB's renewable energy and energy efficiency objectives. The project is located in a cohesion priority region. The financing of this project contributes to the EIB's lending priority objectives on renewable energy, as well as on climate action and social cohesion.

Additionality and Impact

The Bank's investment in the project will support the deployment of new renewable energy capacity in Poland, crucial for the achievement of the 2030 decarbonisation targets set out in the National Energy and Climate Plan. As the individual wind farms are located in less developed regions, the overall investment will also contribute to the cohesion objective. The financing of this project also contributes to Bank's renewable energy and climate action (transversal) lending objectives.
In terms of addressing market failures, these onshore wind projects primarily reduce carbon and air pollution externalities. Moreover, the projects provide new generation capacity in a sector characterised by incomplete markets, relying on public Contracts for Difference (CfD) with exposure to residual market risks. It thereby contributes to the policy objective of supporting market integration of renewable energy projects.
The operation is expected to yield good quality and results, thanks to avoided GHG emissions, fair employment creation and governance arrangements.
The Bank's contribution will be most visible on the financial contribution side by accelerating the fundraising process and crowding in other financiers. The Bank provides expertise in structuring and lending to renewable energy projects, applying standard and well tested project finance principles. This will improve the structuring of the operation through close co-operation with the promoter and the commercial lenders.

Aspects environnementaux
Passation des marchés

Windfarms fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU) according to which it is up to the competent authorities in the EU Member States to determine that the project is subject to an EIA. According to the national legislation, windfarms exceeding certain criteria are subject to a mandatory EIA. This was the case for all windfarms. The environmental studies for the EIA process were undertaken and the competent authorities have granted approval containing requirements to mitigate environmental impacts accordingly. Residual impacts were classified of small magnitude and low significance.

The project will be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC c.q. 2014/25/EU hence private sector procurement procedures are applied. Equipment and works were purchased through multi contracts such as one for supply and installation of turbines, others for infrastructure works (Balance of Plant), electrical works, etc.

Milestone
À l'examen
Approuvé
Signé
11 mars 2021
13 janvier 2022
Lien vers la source
Fiche récapitulative
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - EDPR POLAND GREEN ENERGY LOAN
Date de publication
18 Apr 2023
Langue
Sujet général
Prêts
Numéro du document
136014495
Thématique du document
Information Environnementale
Numéro du projet
20200453
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Autres liens

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes