Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

UNITRANCHE BRIDGE FINANCING

Signature(s)

Montant
100 000 000 €
Pays
Secteur(s)
Portugal : 20 000 000 €
Espagne : 80 000 000 €
Énergie : 100 000 000 €
Date(s) de signature
17/12/2021 : 20 000 000 €
17/12/2021 : 80 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
2 septembre 2021
Statut
Référence
Signé | 17/12/2021
20200899
Nom du projet
Promoteur – Intermédiaire financier
UNITRANCHE BRIDGE FINANCING
BEN OLDMAN ADVISORS SARL
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 100 million
EUR 285 million
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The proposed EIB operation will finance a lending vehicle that will provide unitranche loans to solar photovoltaic (PV) and wind on-shore projects in Iberia.

The proposed EIB operation will finance a Vehicle that will provide unitranche loans to solar PV and wind on-shore projects (SPVs) in Iberia (Spain and Portugal). The vehicle is promoted and managed by Ben Oldman (the Promoter) and expects to invest EUR 200 million through unitranche loans in 2-3 years. The vehicle will be funded by a junior bond subscribed by investors and by a senior facility provided by EIB.

Additionality and Impact

The proposed EIB operation is a senior Framework Loan to a lending vehicle (the "Vehicle") created to provide tailor-made senior loans to merchant solar PV and wind on-shore projects in Iberia (Spain and Portugal) developed by small and medium size developers. 


The projects financed by this operation will increase the renewable energy generation capacity in Spain and Portugal and will contribute to national and EU 2030 climate objectives.The financing of this project also contributes to the Bank's lending priority objectives in renewable energy, climate action, and economic and social cohesion. Electricity will be produced from low carbon sources (solar PV and on-shore wind),addressing the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation).The projects will rely on revenues from the market (the wholesale market and unsubsidized commercial PPAs), in a sector characterised by incomplete markets and thereby, the projects will improve market efficiency and competition.It is expected to yield very good quality and results due to excellent social benefits and fair employment creation.With the appropriate conditions in place, the project is acceptable for financing in environmental and social terms.

Aspects environnementaux
Passation des marchés

Details of the Promoter's environmental and social due diligence procedures for ensuring compliance with relevant EU and national legislation and EIB's Environmental and Social Standards as well as the capacity of the Promoter to assess and monitor environmental and social risks and impacts, will be reviewed during appraisal. The assessment of the environmental and social impacts and risks will be part of the standard due diligence process that the Fund will have to carry out for each underlying investment, thereby ensuring that the portfolio and these investments are in compliance with national law, EU environmental legislation as well as the EIB Environmental and Social Standards.

The Promoter has been assessed by the EIB as being a private company not subject to EU rules on public procurement or concessions. However, if after the project appraisal, the EIB were to conclude that the Promoter is after all subject to EU public procurement legislation (Directive 2014/23/EU / 2014/24/EU 2014/25/E), where applicable, then the Bank would require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/23/EU /2014/24/EU / 2014/25/EU) where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

Lien vers la source
Fiche récapitulative

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - UNITRANCHE BRIDGE FINANCING
Date de publication
1 Feb 2022
Langue
Sujet général
Prêts
Numéro du document
141777250
Thématique du document
Information Environnementale
Numéro du projet
20200899
Secteur(s)
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes