Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

ERG RENEWABLE ENERGY GREEN LOAN

Signature(s)

Montant
243 000 000 €
Pays
Secteur(s)
Allemagne : 7 395 000 €
France : 66 333 750 €
Italie : 169 271 250 €
Énergie : 243 000 000 €
Date(s) de signature
16/12/2024 : 7 395 000 €
16/12/2024 : 66 333 750 €
16/12/2024 : 169 271 250 €
Lien vers la source

Fiche récapitulative

Date de publication
21 mai 2024
Statut
Référence
Signé | 16/12/2024
20230992
Nom du projet
Promoteur – Intermédiaire financier
ERG RENEWABLE ENERGY GREEN LOAN
ERG SPA
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 243 million
EUR 366 million
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The operation will finance a portfolio of 269 MW of onshore wind and solar photovoltaic (PV) plants.

The project concerns 3 greenfield onshore wind farms in France, the repowering of three existing onshore wind farms in Italy (2) and in Germany (1), as well as the repowering of 7 solar PV plants in southern Italy.

Additionality and Impact

The Project produces electricity from sustainable low carbon sources (solar PV and onshore wind) and addresses the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution. The Project supports EU Renewable Energy objectives and supports Italy, France, and Germany in meeting their commitments with respect to renewable energy targets and greenhouse gas emission reductions set out in their Integrated National Energy and Climate Plan. Around 97% of total installed capacity of the onshore wind and PV portfolio will be built in Cohesion regions.

 

The Project's portfolio will rely on renewable energy supporting schemes and on Power Purchase Agreements for ca. 95% of its generation. Only marginally, the plants' portfolio will be exposed to merchant risks. The Project thereby contributes to the policy objective of supporting market integration of renewable energy projects. 

 

The financing of this Project also contributes to Bank's lending priority objectives on Energy (Renewable Energy) as well as on Climate Action and Environmental Sustainability (transversal), and economic and social Cohesion (transversal).


EIB's financial contribution is deemed valuable to the Promoter due to its crowding in effect and more favourable financial terms than the alternative sources of financing. Furthermore, the EIB's involvement is expected to send a positive signal to the market and strengthen other potential lenders and investors in ERG's business plan as a pure wind and solar power provider.

Aspects environnementaux
Passation des marchés

The individual plants and most of the ancillary infrastructure fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU amended by the Directive 2014/52/EU. New overhead transmission lines for the interconnection of the schemes to the grid, if part of the Project and if falling under the Annex I due to their technical characteristics, will be expected to be subject in all cases to an EIA process. Five wind power plants and associated infrastructure underwent an EIA process with all main permits issued to date. One wind power plant (comprising only one turbine) was screened out from an EIA by the relevant authorities. The permit is in force at the time of appraisal and there is no appeal pending. The repowering of the existing solar PV plants was not subject to EIAs, corresponding major consents have already been issued. None of the plants are located inside Natura 2000 sites, but some of them have protected sites in the vicinity, including but not limited to: SAC Montagna Grande di Salemi (ITA010023), SAC Complesso Monti di Santa Ninfa - Gibellina e Grotta di Santa Ninfa (ITA010022), SAC Muldetal bei Aue (DE5341303), and SAC Kalkbrüche im Wildenfelser Zwischengebirge (DE5341302). The authoristion procedures and compliance with the relevant EU directives, specifically Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively), will be assessed at appraisal, in particular the potential cumulative impacts assessment and the impacts on protected flora and fauna, including Natura 2000 sites. Given that China largely dominates the market of photovoltaic solar panels, and media reports that supply chain of these products would involve forced labour, the Bank will apply an enhanced due diligence on the topic, in line with the EIB's Environmental & Social Standards.

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the Promoter is subject to the EU public procurement legislation then the Bank would duly inform the Commission Services and would require the Promoter to apply those rules.

Milestone
À l'examen
Approuvé
Signé
13 août 2024
16 décembre 2024
Lien vers la source
Fiche récapitulative

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - ERG RENEWABLE ENERGY GREEN LOAN
Date de publication
14 Sep 2024
Langue
Sujet général
Prêts
Numéro du document
197707689
Thématique du document
Information Environnementale
Numéro du projet
20230992
Secteur(s)
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes