Date de publication: 2 mai 2011
Promoteur – Intermédiaire Financier
AES Corp and the Republic of Cameroon
Lieu
Description
Construction of a gas-fired power plant with installed capacity of 216MW and a 100 km transmission line (225 kV) connecting the production site to the town of Edéa.
Objectifs
The aim of the project is to increase electricity generation capacity and address the serious power shortage blocking the country's development.
Commentaires
The project will be appraised by the EIB subject to the successful conclusion of the review of the legal framework for the electricity sector.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 40 million
Coût total (montant approximatif)
EUR 256 million
Aspects environnementaux
The project and related facilities present environmental and social challenges: acquiring the site will entail the physical displacement of a relatively small number of people and the economic displacement of a large proportion of them. Gas combustion at the plant will result in the emission of greenhouse and other gases. All environmental and social aspects of the project will be examined in detail during the appraisal.
Passation des marchés
The promoters are obliged to comply with the EIB's procurement procedures, which reflect the requirements of the corresponding EU directive.
Statut
Signé - 17/01/2012
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).