Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20070244
Date de publication: 26 février 2008

Promoteur – Intermédiaire Financier

JP Elektromreza Srbije

Lieu

Description

Design, supply, construction, and operation of six power substations.

Objectifs

The project has the purpose of maintaining and improving the reliability and quality of power supply, reducing technical losses, and lowering operation and maintenance costs. The schemes are geographically dispersed all over Serbia.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 25 million

Coût total (montant approximatif)

EUR 50 million

Aspects environnementaux

The Bank’s services, in co-operation with the European Commission, will take particular care to ensure that proper attention is given to all environmental concerns and appropriate mitigation measures are implemented, in line with the Bank’s relevant guidelines, including issues relating to nature conservation areas.

Passation des marchés

The Bank will require the Promoter to ensure that contracts for the implementation of the Project shall be tendered in accordance with the EIB Guidelines and the relevant applicable EU procurement legislation with parallel publication of tender notices in the EU Official Journal.

Statut

Signé - 12/06/2009

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Serbie Énergie