    Référence: 20080263
    Date de publication: 11 mai 2010

    Promoteur – Intermédiaire Financier

    For the power plant: Itezhi-Tezhi Power Corportion, Attn. Mr Robert Nsamba, Director
    Phone +260 (211) 239 343 Fax +260 (211) 239 343 e-mail: rnsamba@itpc.co.zm.
    For the transmision lines: ZESCO, Mr. Julius Kampamba Acting Senior Manager Transmission Development
    Phone +260 (211) 363 521 e-mail: jkampamba@zesco.co.zm.

    Lieu

    Description

    The project consists of a new 120 MW hydropower plant, benefiting from the use of an existing dam and a reservoir infrastructure, and a 260 km extension of the 220/330 kV transmission system to supply renewable energy to meet the growing demand of the country and the region.

    Objectifs

    The project is expected to provide electricity at a competitive cost to the Zambian and Southern Africa regional electricity networks. The majority of the power plant projects currently under implementation in the region are based on conventional coal-fired technology. This project will therefore contribute to avoiding emissions of CO2 and other harmful air pollutants. The Zambian electricity network has a severe generation deficit, which has resulted in load shedding and related damages to the economy of the country and of the region. The project is in line with the economic development and environmental objectives of the Cotounou Mandate, as well as the EU’s environmental policies with respect to climate change and renewable energy.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 50 million.

    Coût total (montant approximatif)

    Indicative amount: EUR 265 million.

    Aspects environnementaux

    Due to its size and technical characteristics the power plant, if located inside the EU, would be classified under Annex II of the EIA Directive and the high voltage overhead transmission lines under Annex I, requiring an Environmental Impact Assessment. The promoters have implemented two EIAs, one for the power plant and another one for transmission investments. Both EIAs cover the cumulative effects of the project. The project will comply with the Bank’s environmental and social guidelines, including appropriate public consultation and mitigation of impacts on biodiversity.

    Passation des marchés

    The promoters will be required to conduct procurement for the project components in line with the Banks Guide to Procurement.

    Statut

    Signé - 10/12/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Zambie Énergie