    Référence: 20090154
    Date de publication: 27 juillet 2009

    Promoteur – Intermédiaire Financier

    Société du Réseau Ferroviaire Rapide

    Lieu

    Description

    The project concerns the construction of two urban railway lines in the metropolitan area of Tunis, including the acquisition of rolling stock. The two lines will be 18 km long and they will be the first section of a wider urban railway network including five lines for a total length of 85 km.

    Objectifs

    The objective of the proposed operation is to provide long-term financing for the public transportation sector in Tunisia. Offering a new high quality public transport service in the metropolitan area of Tunis will raise the attractiveness of public transport compared to private cars and will allow the reduction of bus services, thus reducing the overall impact of urban transport on the environment.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 177 million.

    Coût total (montant approximatif)

    EUR 550 million.

    Aspects environnementaux

    The Promoter has informed the Bank that an EIA has already been carried out and its content will be checked during appraisal. The project has to meet the environmental and social requirements of the Bank based on EU policy. In particular, compliance with the substance of EIA directive and social aspects will be analysed during appraisal. If it were in the EU, the project would fall under Annex II of EIA Directive: accordingly, an EIA would not be required but should be considered by the competent authority in order to comply with the local and national legal framework.

    Passation des marchés

    The EIB will require the promoter to comply with the basic principles of the EU policy on procurement. This issue will be analysed during appraisal.

    Statut

    Signé - 10/12/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Tunisie Transports