    Référence: 20120340
    Date de publication: 22 mai 2013

    Promoteur – Intermédiaire Financier

    Kaxu Solar One Ltd

    Lieu

    Description

    The project concerns the construction and operation of a greenfield concentrated solar power (CSP) plant with 100 MW of installed power generating capacity.

    Objectifs

    The operation will support the objectives of the South African government to increase the share of renewable energy generation and enhance the efficiency of energy use.

    Commentaires

    Intermediaries are the Development Bank of Southern Africa and FirstRand Bank Ltd. This operation is covered by the EU Political Risk Guarantee for EIB loans outside the EU.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 210 million

    Coût total (montant approximatif)

    EUR 569 million

    Aspects environnementaux

    If the project were located in the EU, it would fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU) as amended, requiring the competent national authority to determine the need for an EIA. Under South African law, the project requires a mandatory EIA including initial scoping and public consultation. During appraisal, the Bank will ensure that the project complies with the Bank's principles and standards as regards environmental and social issues.

    Passation des marchés

    The project concession has a local preference element requiring the promoter to procure domestically 20% of its investment. The required local component is well below the level at which parts can naturally be sourced locally and at economic prices. A more detailed assessment has been performed by the Bank, verifying that the project meets the Bank's criteria of economy and efficiency.

    Statut

    Signé - 29/10/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.