Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20150842
Date de publication: 25 janvier 2017

Promoteur – Intermédiaire Financier

HAMBURG PORT AUTHORITY

Lieu

Description

The project includes the construction of a new double-track railway lift bridge (New Kattwyk Railway Bridge), the construction of a new railway engine service plant, renovation works across the existing railway network inside the port of Hamburg and the acquisition of a firefighting vessel.

Objectifs

The project will contribute to the improved safety, efficiency and capacity of operations in the port of Hamburg.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 150 million

Coût total (montant approximatif)

EUR 341 million

Aspects environnementaux

The project's compliance with the Strategic Environmental Assessment (SEA) Directive 2001/42/EC, Environmental Impact Assessment (EIA) Directive 2011/92/EC, the Habitats Directive 92/43/EEC, the Birds Directive 2009/147/EC and the Water Framework Directive 2000/60/EC (as amended) will be verified during appraisal, including the status of any environmental studies and public consultation, mitigation/compensation measures, environmental and social monitoring plans and biodiversity assessment requirements.

Passation des marchés

The promoter, Hamburg Port Authority, is a contracting entity within the meaning of Directive 2004/17/EC. The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (2004/17/EC as well as Directive 2007/66/EC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 18/12/2017

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Allemagne Transports