Date de publication: 7 octobre 2020
Promoteur – Intermédiaire Financier
LILONGWE WATER BOARDLieu
Description
Construction of a new water treatment plant for the city of Lilongwe, Malawi.
Objectifs
The overall objective of the project is to significantly increase the capacity to supply clean water to the city and suburbs of Lilongwe.
Secteur(s)
- Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
Montant BEI envisagé (montant approximatif)
EUR 15 million
Coût total (montant approximatif)
EUR 50 million
Aspects environnementaux
This operation is the twelfth in Malawi in the water sector and will build on the experience gained in these previous projects. An Environmental and Social Assessment as well as a Resettlement Action Plan (if needed) will be carried out as part of the design activities. The project shall have positive environmental and public health impacts and will allow the population to adapt to the foreseen climate change impacts in the project areas. The Bank will verify the environmental and social risks and impacts of the project components, as well as proposed mitigation and compensation measures, in accordance with the EIB's Environmental and Social standards, as set out in Vol I of the EIB Environmental and Social Handbook.
Passation des marchés
The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.
Statut
Signé - 23/12/2020
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).