Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20200037
Date de publication: 16 juin 2020

Promoteur – Intermédiaire Financier

EDP RENOVAVEIS SA

Lieu

Description

The project concerns the construction and operation of 2 new, medium sized wind farms located in the north and the west of Portugal with a total capacity of 125 MW.

Objectifs

The project will support EU and national targets for renewable energy generation, and contributes to the security of energy supply and environmental objectives. It will also further contribute the EIB's lending priority policy on social cohesion, renewable energy and climate action.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 65 million

Coût total (montant approximatif)

EUR 127 million

Aspects environnementaux

Windfarms fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU) according to which the EU Member States has to determine whether a project is subject to an assessment based on defined criteria. According to national legislation, windfarms exceeding certain criteria are subject to a mandatory EIA. This was the case for both windfarms. The environmental studies for the EIA process were undertaken and the competent authorities have granted approval containing requirements to mitigate environmental impacts accordingly. Residual impacts were classified of limited significance.

Passation des marchés

The project will be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC c.q. 2014/25/EU hence private sector procurement procedures applied. Equipment and works were purchased through multi contracts – such as one for supply and installation of turbines, others for infrastructure works (Balance of Plant), electrical works, etc.

Statut

Signé - 23/12/2020

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Portugal Énergie