Date de publication: 22 mai 2023
Promoteur – Intermédiaire Financier
TEPLARNY BRNO ASLieu
Description
The project will finance the upgrade of the heat generation and distribution system in the City of Brno, including construction of a new biomass combined heat and power (CHP) unit.
Additionality and Impact
EIB financing will allow the promoter to construct a new biomass CHP unit, and refurbish and extend the district heating network. The project will increase the share of renewable energy sources in Czechia's heating sector, which is currently at 23.5% and the 2020 National energy and climate plan expects to reach 30.7% by 2030.
The financing of this project will contribute to Bank's priority objectives on energy, climate action and cohesion priority regions. Such investment is crucial to improve security, energy efficiency and flexibility of heat supply and meet demand for heat. The project addresses several market failures: Low-carbon projects reduce carbon externalities, they contribute also towards security of supply by reducing dependency on imported fossil fuels. Security of supply can be considered as a public good.
The financial value added provided by the EIB loan includes attractive pricing, long maturity and flexible drawdown conditions. The tenor of the EIB loan is in line with the economic life of the underlying assets and will provide sufficient financial capacity to implement the project and retain healthy financial condition of the borrower. The project has excellent economic justification and generates additional employment in construction. The capacity of the promoter is considered appropriate for the proposed project.
Objectifs
The aim is to increase the heat production from renewable fuel through construction of a biomass CHP unit, decrease network losses through the modernisation of the grid and elimination of steam pipelines and connect new customers.
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Montant BEI envisagé (montant approximatif)
EUR 75 million
Coût total (montant approximatif)
EUR 164 million
Aspects environnementaux
Some schemes of the investment programme may fall under Annex II of the Environmental Impact Assessemnt (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU, thus requiring a review by the competent authorities at the planning/consent stage with due regard to the necessity for environmental and biodiversity impact and appropriate assessments. The environmental aspects of the programme will be appropriately assessed as part of the EIB's appraisal process. As the Project includes the investment in a biomass-fired CHP unit among other schemes, the assessment will concern also the sustainability of biomass.
Passation des marchés
The Bank will require the Promoter to ensure that contracts for the implementation of the Project have been and will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/25/EU, and/or 2014/23/EU where applicable, as well as the Directive 92/13/EEC and/or Directive 89/665/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Statut
Signé - 17/05/2023
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).