Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20220762
Date de publication: 8 août 2023

Promoteur – Intermédiaire Financier

DEN KOMMUNALE SELVSTYREHAVN ESBJERG HAVN

Lieu

Description

The project will expand the capacity of the Port of Esbjerg, by deepening of the navigation channel to enhance the port's capacity and interconnectivity for both civil and military use. It will also create a new 57ha terminal to cater to the needs of the offshore wind energy industry of the North Sea. Additionally, it will include coastal protection measures to prevent flooding as part of the Climate and Risk Control Plan of the City of Esbjerg.

Additionality and Impact

The project facilitates to reduce costs for maritime transport and sustainable multimodal transport. It supports the development of offshore renewable energy. The EIB loan provides PORT ESBJERG with flexible terms and long tenors. Furthermore, the loan complements the diversified debt portfolio of PORT ESBJERG as well as the grants provided by the European Commission and the Danish Government.

Objectifs

The project will enhance intermodal transport, thus improving the sustainability of the transport chains, in line with the EU objectives related to TEN-T network development. Furthermore, it will contribute to the EU Action Plan for Military Mobility. Part of the project will also improve flood protection. As the facilities will also be used to install offshore wind farms, the project will also reduce the costs for the development of offshore renewable energy infrastructure in Europe and hence contributes to the renewable energy objectives set by the EU energy policy.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 115 million

Coût total (montant approximatif)

EUR 236 million

Aspects environnementaux

During the appraisal phase, the EIB will assess the project's compliance with the Environmental Impact Assessment EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU). Compliance with the Water Framework Directive 2000/60/EC (as amended), the Floods Directive 2007/60/EC, the Habitats Directive 92/43/EEC and Birds Directive 2009/147/EC will also be further verified at appraisal.

Passation des marchés

The promoter has to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

Signé - 20/06/2024

Milestone
À l'examen
Approuvé
Signé
18 juin 2024
20 juin 2024

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Danemark Transports