    Référence: 20220839
    Date de publication: 20 mars 2023

    Promoteur – Intermédiaire Financier

    ROMANIA

    Lieu

    Description

    The project concerns the construction of about 320 km of the new greenfield A7 motorway between the towns of Ploiesti and Pascani in Eastern Romania, which is part of the Core Trans-European Transport Network (TEN-T).

    Additionality and Impact

    The proposed project concerns the construction of 319 km of the new A7 motorway between the towns of Ploiesti and Pascani in Eastern Romania. The Project addresses the market/network failure related to accessibility along the core TEN-T Network in the less developed regions of Nord-Est (NUTS RO21), Sud-Est (NUTS RO22) and Sud-Muntenia (NUTS RO31). The project is expected to generate economic benefits from time savings, safety improvements and vehicle operating cost reductions. The project benefits from PASU (Project Advisory Support Unit) Technical Assistance to the Managing Authority and limited support from JASPERS at project preparation. In addition to advisory support, the Bank's more favourable conditions of the EIB loan (in particular a longer maturity and lower interest than available on the market) have a significant impact on the operation. The EIB loan will partially finance the State contribution to the project alongside RRF funds of EUR 1,947m.


    Objectifs

    The project will generate multiple economic benefits, notably in terms of time saving, safety improvement and vehicle operating cost reduction.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 1200 million

    Coût total (montant approximatif)

    EUR 6717 million

    Aspects environnementaux

    The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU and is therefore subject to EIA procedure. Environmental decisions for all the project sections have already been issued between 2021 and 2022. The project alignment crosses and/or affects 31 Natura 2000 sites. Appropriate Assessments have already been carried out between November 2020 and November 2021. Particular attention during the appraisal will be on foreseen measures for mitigating any potential negative impact on Natura 2000 specific conservation objectives.

    Passation des marchés

    The EIB will require the promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 14/06/2023

    Milestone
    À l'examen
    Approuvé
    Signé
    3 mai 2023
    14 juin 2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).