    The project includes investments in the public transport (PT) and district heating (DH) networks as follows: rehabilitation of approximately 50 kms of tram tracks including platforms and the related contact network, tram acquisition, depot modernisation and rehabilitation of the hot water transmission pipelines by replacing approx. 106 km channel length of pipes.

    Objectifs

    The project is part of a wider programme of transport and district heating investments carried out by the Municipality of Bucharest to modernise and increase the performance of existing urban infrastructure and benefits from EU co-financing. The loan will contribute to improving quality, reliability, safety and accessibility of the tram system and increase the energy efficiency of the Bucharest district heating system as well as the level of service provided to households.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    • Transports - Transports et entreposage

    Montant BEI envisagé (montant approximatif)

    EUR 300 million

    Coût total (montant approximatif)

    EUR 1340 million

    Aspects environnementaux

    The promoter's environmental management capacity to apply the relevant EU Directives will be further verified during appraisal, particularly with regard to EU EIA Directive 2011/92/EU amended by 2014/52/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC, EU Birds Directive 2009/147/EC and Water Framework Directive.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with EU procurement legislation, 2014/25/EU or 2014/24/EU where applicable as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Approuvé - 15/11/2023

    Milestone
    À l'examen
    Approuvé
    15 novembre 2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Roumanie Énergie Transports