Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20230560
Date de publication: 26 août 2024

Promoteur – Intermédiaire Financier

SCHIPHOL NEDERLAND BV

Lieu

Description

The project will finance the upgrade of the passenger security screening equipment and baggage handling system (BHS) at Amsterdam Airport Schiphol. In detail, the investments concern the installation of last generation cabin baggage screening equipment across all terminal buildings and a state-of-the-art automated and robotised baggage handling system (BHS) to be located in a new basement, the "South BHS area", which will address the much-needed renewal of current baggage handling halls.

Additionality and Impact

The project covers investments into the renewal and upgrade of Schiphol Airport, including the construction of a further automated and/or robotised baggage handling system and new security screening equipment. With the investments, Schiphol Airport enhances its operational capabilities, to the benefit of both passengers and staff, while ensuring the highest safety and security standards.


The project contributes to the Bank's Strategic European Security Initiative, which is aligned with the EU's security and defence agenda, in particular for civilian security infrastructure, and cutting-edge technology projects. The project will be implemented at Schiphol Airport a key EU Core TEN-T airport hub, making it eligible under Article 309 point (c) common interest.


The proposed EIB loan enhances the financial feasibility of the investments and contributes to the development of resilient and sustainable airport operations.

Objectifs

The aim is to upgrade and further automate the airport's operations, improve operational reliability and working conditions as well as apply the highest screening security standards to contribute to safety.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 400 million

Coût total (montant approximatif)

EUR 1100 million

Aspects environnementaux

The scope of works of the project is not expected to fall under Annexes I or II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU and therefore screening decisions by competent authorities are not expected. The project is expected to contribute to climate action and environmental sustainability objectives, in particular to climate mitigation, pollution prevention and control.

Passation des marchés

The EIB will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

Signé - 24/12/2024

Milestone
À l'examen
Approuvé
Signé
25 novembre 2024
24 décembre 2024

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pays-Bas Transports