Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20230602
Date de publication: 13 décembre 2023

Promoteur – Intermédiaire Financier

MVM ENERGETIKA ZRT

Lieu

Description

The operation concerns the purchase of Green Bonds to finance MVM's investments in renewable energy, electricity networks and clean transportation included in the company's green bond framework.

Objectifs

The proposed operation consists of the purchase of one or several senior green bonds, the proceeds of which will finance new or existing investments in the following sectors in Hungary, as set out in the Promoter's green financing framework: renewable energy electricity generation, production of green hydrogen, transmission or distribution of electricity, storage of electricity or hydrogen. By the end of the allocation period, the issuer will have allocated a portion of the funds to an agreed amount of new eligible investments. The underlying projects are not known at this stage.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 350 million

Coût total (montant approximatif)

EUR 700 million

Aspects environnementaux

The schemes underlying the operation will fall under Annex I or II of the EIA-Directive 2011/92/EU, requiring either an EIA including public consultation, or screening by the national competent authority on the basis of Annex III of the same Directive to determine the need for an environmental impact assessment (EIA). Where and if applicable, the requirements of EU legislation, mainly the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC, will be verified during appraisal.

Passation des marchés

The Bank will require the promoter to ensure that contracts for implementation of the underlying eligible project will be tendered in accordance with the applicable EU procurement legislation, i.e. Directives 2014/23/EU, 2014/24/EU or 2014/25/EU as well a s Directive 92/13/EEC or Directive 89/665/EEC as applicable and interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

Approuvé - 19/12/2023

Milestone
À l'examen
Approuvé
19 décembre 2023

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Hongrie Énergie