    The operation consists of an investment into two renewable energy heat generation projects in the district heating sector. The projects are: (i) heat pump plant (ii) fuel conversion from coal to biomass pellets.

    Additionality and Impact

    The Project concerns the construction of two District Heating (DH) generation units located in Helsinki. The first unit is a heat pump (90 MW) which will use recovered energy (excess heat from purified sewage water), the second unit (163 MW) is an existing coal plant converted to wood pellets. The renewable (RE) share of both investments is 100%, contributing to increase the overall RE share of Helsinki's DH system. The Project is in line with EU and EIB policy objectives on climate action (mitigation) and is also fully in line with national objective for increasing renewable and waste heat supply. It generates both environmental and health benefits, in particular by replacing coal-based generation with the integration of more sustainable and competitive sources of useful heat. This ultimately decreases energy costs and reduces carbon emissions, and air pollution. The Project also contributes to maintaining or increasing safe delivery of heat supply. The financing of this Project is therefore in line with the Bank's lending priority objectives for Energy (Decarbonising Energy Supply) as well as the transversal objective on Climate Action (Mitigation).

    In terms of project results, the projects are expected to have a positive economic return, considering the economic value of the heat generated. Therefore, the project is expected to generate a broader positive social benefit by generating clean and renewable heat at a cost reasonably below the cost alternatives in Finland.

    The project is supported by adequate governance and capabilities of the promoter.

    The proposed loan will diversify the borrower's financing sources and thus strengthen the overall financing position of the company. The EIB loan's long tenor is highly valuable to the promoter in financing assets with long economic lifetimes. The Bank's loan complements Helen's other sustainable finance instruments and supports the company's investments related to carbon neutral energy systems.


    Objectifs

    The aim is to substitute fossil-fuel based central heating with a more sustainable and efficient renewable generation mix, resulting in a reduction of greenhouse gases emissions and lower air pollution.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 150 million

    Coût total (montant approximatif)

    EUR 209 million

    Aspects environnementaux

    Regarding the compliance with the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU), based on the information communicated by the promoter, the planned units will not have to undergo EIAs. The wood pellets to be used will need to comply with the EIB's sustainability criteria. The potential environmental and social impacts, the permitting processes, the promoter's environmental capacity, as well as the alignment with the relevant environmental legislation, will be reviewed during the appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the Project have been and will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/25/EU, and/or 2014/23/EU where applicable, as well as the Directive 92/13/EEC and/or Directive 89/665/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 18/04/2024

    Milestone
    À l'examen
    Approuvé
    Signé
    21 mars 2024
    18 avril 2024

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Finlande Énergie