Date de publication: 19 juin 2024
Promoteur – Intermédiaire Financier
MINISTRY OF MARITIME AFFAIRS, TRANSPORT AND INFRASTRUCTURELieu
Description
This is an allocation under the EIB's signed project "Railway Development Framework Loan Croatia (2022-0660). The present operation will finance investments into new passenger rolling stock to be used under a public service contract. In detail, it supports the purchase of: (i) six bi-mode (diesel-electric) multiple units to operate regional and intercity services on the route from Zagreb to Split (ii) four battery only powered multiple units to operate in the Split and Istrian region (iii) four battery-electrically powered multiple units on the routes Zagreb-Krapina and Zagreb-Bjelovar. The acquisition of the new rolling stock will be implemented by HZ Putnicki prijevoz (HZPP).
Objectifs
The aim of the new rolling stock is to replace the current outdated and technologically obsolete units.
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
EUR 113 million
Coût total (montant approximatif)
EUR 155 million
Aspects environnementaux
The project does not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (amended by Directive 2014/52/EU). If applicable, the promoter will be required to provide evidence of conformity of the construction of any associated facilities (e.g. maintenance workshops or depots) with the requirements of the EIA Directive, Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC), as well as to ensure that any replaced rolling stock is disposed of in conformity with the applicable environmental regulations. The rolling stock will be in conformity with the applicable Technical Specifications for Interoperability (TSI), including the Regulation 2014/1300 on the technical specifications for interoperability relating to accessibility of the Union's rail system for persons with disabilities and persons with reduced mobility (PMR).
Passation des marchés
The promoter has to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation (2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. HZPP have already published the tender notice for the six bi-mode trains to operate on the Zagreb to Split line, under reference 162784-2024 (link: https://ted.europa.eu/hr/notice/-/detail/162784-2024). The remaining tender notices are scheduled to be published by the end of 2024.
Statut
À l'examen
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).